Showing posts with label 8 hours. Show all posts
Showing posts with label 8 hours. Show all posts

Thursday, June 17, 2010

post number 114


Here is a pic of my daddy silver soldering my handlebars into their respective castings. I plug welded them in two spots for extra strength!


After the bars were brazed together, I welded some cable blocks onto them, then I was able to get the proper angle on the little cable x piece. By the way those are the two pieces that were in a post a while back.



HEre is one of the cable blocks on the frame. Pretty neat stuff.




I recieved my cannonball shoes in the mail yesterday. They are very uncomfortable, so I have been wearing them around the shop in hopes of getting used to them.


Sunday, May 23, 2010

post number 93


I have been waiting for a long time to do this shot! WOOO HOOO! Still a lot of work to do, in a couple months, but there is a light at the end of the tunnel.


Here is the front rocker stud. I will be using a friction dampner similar to jd racers. This seems like a good theory and hopefully will be worth the effort.



HEre are the rocker studs for my front end. I made them today. They are made out of 8620 steel and will be case hardened and finished ground!

Sunday, April 4, 2010

post 64


The lever on the left is the one that I tried drilling free hand. I suck at anything freehand, fortunately I am good at making fixtures. Once I made a simple mill fixture I turned out nine use able perfect pieces!



Here is a completed lever. This is for the de compression and mag advance.

Here is the bung that I made for my gas valve. It turned out well. I am using a 1916 to 1939 petcock.





Here it is all welded up. I also finished welding up my gas tank. I measured all of the seams that got welded up and there was over seven and a half feet of welding that had to be done!