Showing posts with label 50 hours. Show all posts
Showing posts with label 50 hours. Show all posts

Monday, July 12, 2010

post number 121


I burnt my arm with a hot fender brace, it just touched it for a second, but that is all it took. dang it


Here is where my oil pump is going to mount. The belt pully will be driven off of the motor sprocket. we are doing a 4 -1 ratio. This is going to be trick



HEre is what the cam set and lifter set up looks like. I ended up using different lifters than these, but didn't take a pic




Here is a pic of my flywheels in the cases for good! We trued them up within a thousandth on each shaft in the truing stand, then marked where the pinion flywheel was, so that we could measure the assembly in the case. After assembling everything in the case we checked it out with this set up, and the numbers were all perfect! I put the right case on tightened everything up, put the pistons on with out rings, installed the cylinders and checked to see how everything spun over and you can turn the whole assembly over with just two fingers, everything is smooth, perpendicular and square! I have not had much time to post ,I only have 26 days to finish the bike, so I will most likely be doing posts that cover a lot of steps rather than the super detailed posts like the previous ones. Wish me luck, I need it!

Wednesday, July 7, 2010

post number 120


Here is a pic of the inside of my oil tank before I welded the last side on. There is a lot of stuff going on in this little box. It would hold 4.25 quarts of oil, but I will probably only run three and a half.


Here is a pic of both tanks, I spent 12 hours pressure testing them and making sure that they dont leak. what a bunch of damn work. There are over eight feet of welding on the gas tank alone. I put the fake door on the toolbox, just cause it looks so finished and nice. I had to weld the inside of the rivets and the screws that hold the door shut. There were only three leaks in the toolbox and probably 20 in the gas tank! The main thing is that I got both of them sealed up and off for body work!



I engine turned my cases tonight. This is a very tedious process.




Here is a pic of the left case. The circles are about 5/8 of an inch from the edge of the case. The swirls are .75 and overlap half of the previous circle. What a bunch of damn rotating on the rotary table. AFter seeing the finished product, it is worth all of the work!





And the other side!!!!! This looks like a piece of jewelery and it should be in a glass case or up on a pedestal. I should have my front end and front fender finished up by this weekend, as well as my engine. The pieces are falling into place! I have to have the bike looking done by sturgis! whoa man the clock is ticking!