Showing posts with label 3.5 hours. Show all posts
Showing posts with label 3.5 hours. Show all posts

Tuesday, May 18, 2010

post number 88


One of the first pieces that I made for my sears project was the top clamp for the handlebars. I matched it up to the original fork that I had and it turned out pretty well. The only problem with it is that I didn't notice that my og fork was bent. So consequently, the first top clamp that I made only fits on the bent fork that it was made for.. and not on newly made non bent fork! So I made a new one. Here are the five pieces that it takes to make a top clamp


Here they are all welded together and mostly ground down. I had to go back and fill in some low spots with filler rod, but it is coming along quite nicely. The next step is to cut the groove through the center then drill and tap the 3/8 24 holes for the pinch bolts. This is going a lot quicker than the first one and should hopefully be done tonight!

Monday, November 16, 2009

post number 21


I rolled the toolbox over this chunk of big aluminum to get the radius.


Here is the radius on top of the out line.



Roger and I made a miscalculation when we were shearing out the material for the toolbox this morning. I had to make a piece and weld it in. It turned out pretty good, and will be undetectable once the piece is painted. I learned a lot with this project and had fun at the same time.




Here is the finished product. I have to stop by the welding shop tomorrow to pick up some material for the left side. I am not sure how I am going to do the right side yet, but we will figure something out.